☎ Hotline:+86-717-3821822 VR
Yichang Wuxing Material Technology Co., Ltd. Heat Supply and Motor System Energy-saving Comprehensive Renovation Project Completed Environmental Protection Acceptance On-site Inspection Opinion Annex 1
- Categories:Company News
- Author:
- Origin:
- Time of issue:2020-07-02 00:01
- Views:
Yichang Wuxing Material Technology Co., Ltd. Heat Supply and Motor System Energy-saving Comprehensive Renovation Project Completed Environmental Protection Acceptance On-site Inspection Opinion Annex 1
- Categories:Company News
- Author:
- Origin:
- Time of issue:2020-07-02 00:01
- Views:
project |
Environmental impact assessment construction content |
Actual construction content |
Changes |
Waste heat recovery transformation |
Add a waste heat recovery system at the steam vent of the hot-pressing section, add a heat storage tank and a heat recovery tank, each equipped with a water cooling device |
Add a waste heat recovery system at the steam vent of the hot-pressing section, and add a heat storage tank and a heat recovery tank each with a water cooling device |
/ |
Disable the original DZL6-1.25-WII-AI steam boiler and keep the DZL8-1.25-WII-AI steam boiler |
The original boilers are all out of service, and 500*104kcal/h heat conduction oil furnace is used for heating |
The original coal-fired boiler is out of service |
|
Transformation of thermal oil furnace |
Disable the original 800*104kcal/h heat-conducting oil furnace (YLL-800MA) and use 500*104kcal/h heat-conducting oil furnace (YLL-500MAII) |
Disable the original 800*104kcal/h heat-conducting oil furnace (YLL-800MA) and use 500*104kcal/h heat-conducting oil furnace (YLL-500MAII) |
The fuel was changed from coal to biomass, and an economizer was added. |
Motor frequency conversion transformation |
Frequency conversion transformation of 60 motors in the original glue making, dipping and hot pressing sections of the factory |
Frequency conversion transformation of 60 motors in the original glue making, dipping and hot pressing sections of the factory |
/ |
Exhaust gas treatment device |
After being treated by the original wet dust removal and desulfurization device, it is discharged through a 40m chimney |
The new cyclone + bag dust removal device will be discharged through a 30m chimney after treatment |
Wet dust removal is replaced by cyclone + bag dust removal, and the height of the exhaust cylinder is 30m |